The Town of Bourne Integrated Solid Waste Management (ISWM) Facility is approximately 100 acres. SITEC has been providing professional engineering services to the Town of Bourne for the continued operation, expansion and closure of portions of the ISWM since 2001. These services have included the full range of engineering and permitting required to gain approvals from the MA Department of Environmental Protection (MA DEP) for Site Assignment, Authorization to Construct (ATC) and Authorization to Operate (ATO). SITEC services have also included the preparation of Corrective Actions Design (CAD), applications for the closure of phased areas within the ISWM, the preparation of conceptual sites plans for alternative solid waste handling and public drop-off facilities on a 25 acre portion of the ISWM, engineering support for mining (reclamation) within a portion of the ISWM and the completion of bi-monthly inspections and reporting and quarterly survey and volume calculations.

 

Website Design & Hosting by Reynolds DeWalt